Project
Black Hills Pueblo Airport Generation Station
Client
Black Hills Energy - Pueblo, CO
Scope
Construction Management for the mechanical contract consisting two utility-owned natural gas-fired LMS100 units and two combined cycle units. Each of the units will consist of two 40 megawatt natural gas-fired LM6000 turbines and one 20 MW steam turbine.
     
Project
Nacogdoches Power, LLC
Client
Southern Company - Cushing, TX
Scope
EPC contractor for a 100 MW biomass power facility.
   
Project
Dry Fork Station - Unit 1
Client
Basin Electric - Gillette, WY
Scope
Fagen, Inc. performed construction services for Dry Fork Station, a 420 MW power generation facility. Scope of work included above ground civil, structural steel, siding, millwright, and plumbing design/installation.
   
Project
Pearsall Power Plant
Client
South Texas Electrical Cooperative - Pearsall, TX
Scope
Fagen, Inc. was contracted to perform the civil scope of work for this power facility. Fagen, Inc’s scope included foundations and underground utilities for 24 Wartsila 20V34S engines.
   
Project
Wygen III
Client
Black Hills Power - Gillette, WY
Scope
Fagen, Inc. performed complete balance of plant piping and equipment setting at the Wygen 3 Unit 5 Power Project in Gillette, WY, which is a 110 MW coal power facility. The Fagen, Inc. welding rejection rate was less than 1% on 50,000 linear feet of pipe, 25,000 1/2” to 2” and 25,000 2.5” to 24”.
   
Project
Multiple Projects
Client
Wood Group Power Solutions - El Paso, TX - Kountze, TX - Shepherd, TX
Scope
Fagen, Inc. performed similar construction services for three seperate locations in Texas. Fagen, Inc.’s scope of work was the General Works package. The general works package includes excavation, underground duct work , underground conduit, concrete foundations and auger cast piles.
   
Project
Anaerobic Digester
Client
Cargill - Roberts, ID
Scope
EPC for an anaerobic digester which produced power from two GE Jenbacher 416 units, 1.13 MW each including methane collection and storage.
   
Project
Anaerobic Digester
Client
Cargill - Jerome, ID
Scope
EPC for an anaerobic digester which produced power from two GE Jenbacher 416 units, 1.13 MW each including methane collection and storage.
   
Project
St. Bonifacius Generating Station
Client
Great River Energy - St. Bonifacius, MN
Scope
Retrofit of FT-4 Twin Pac. Installation of SSS Clutches. Dismantling and reassembly of both turbines, including stacks. Retrofit accomplished within a six-week shutdown period.
   
Project
  John S. Rainey Generating Station
Client
  Santee Cooper - Iva, SC
Scope
  Installation of underground utilities and concrete foundations. Installation of above-ground mechanical and equipment setting for three each, GE7EA combustion gas turbine generators and auxiliary equipment.
   
Project
  Arapahoe Combined Cycle Project
Client
  Black Hills Energy Capital - Denver, CO
Scope
  Installation of one each, owner furnished, Dresser Rand Steam Turbine Generator (50 MW). Installation of two each HRSGs (new) attached to two LM 6000s. Installation of balance of plant equipment and electrical.
   
Project
  Plant No. 2 - Engine 14 Installment
Client
  City of Chanute - Chanute, KS
Scope
  Installation of one each, owner supplied, Siemens-Westinghouse Model #W251B12 (62 MW) Turbine Generator, including balance plant mechanical and electrical.
   
Project
  Ray Olinger Power Plant - Phase II Gas Turbine Erection Package
Client
  City of Garland - Garland, TX
Scope
  Installation and erection of 76 MW GE Power Systems PG 7121 (EA) combustion gas turbine generator, including foundations, underground utilities, equipment setting and alignment, above-ground mechanical and electrical scope work.
   
Project
  Wolf Hills 2001 Peaker Project
Client
  Constellation Power Source - Bristol, VA
Scope
  Installation of five each, owner supplied, FT-8 Twin Pacs (total of 250 MW). Installation of three each, 13.8 kV/138kV transformers. Design and installation of balance of plant utilities, including switchyard work, water supply, natural gas, compressed air, and sewer systems.
   
Project
  Sarpy County Station - Units 4&5
Client
  Omaha Public Power District - Omaha, NE
Scope
  Engineering, procurement and construction of 100MW turbine system.
   
Project
  Fuel Conversion Project
Client
  Muscatine Power and Water - Muscatine, IA
Scope
  Electrical & Instrumentation
   
Project
  Substation
Client
  Western Area Power Adminsitration - Huron, SD
Scope
  Civil
   
Project
  Turbine Control Pan Disconnection & Replacement
Client
  Boise Cascade - International Falls, MN
Scope
  Electrical
   
Project
  Hydro Governor Installation for 7 Units
Client
  Boise Cascade - International Falls, MN
Scope
  Electrical
   
Project
  GE 20 MVA Transformer Project
Client
  Boise Cascade - International Falls, MN
Scope
  Electrical
 
 